Water heater 1500lx3 with Norsok M-501 painting requirements

Metal production engineering part and outsourced production. Similar volume model was given by client for engineering and production task.

Metal production engineering services:

  • Strength calculations acc. EN13445 of new model and fabrication drawings.

Metal Production outsourced production:

  • Metal Production created drawings related to factory requirements;
  • Metal production organized technical meetings and each step inspection;
  • Documentation follow up and inspection: Quality Control Plan, WPQR, WPS, Production plan, Painting procedure (according to NORSOK M-501), NDT reports, X – ray films, as built drawing, final documentation, third party documentation/certificates ;
  • Review of raw material certificates and traceability insurance;
  • Welding and welds quality inspection;
  • Required tolerance assurance;
  • Necessary action implementation corresponding quality failure;
  • Necessary action implementation corresponding production schedule delay;
  • Pressure test witness;
  • Logistic and custom clearance assurance.