Smart bridge

Smart bridge, a quick-assembly two lanes temporary bridge for road repairs. can also be equipped with telescopic hydraulic supports.
Our team of engineers designed the bridge, performed strength calculations, selected materials, and submitted a commercial offer to the client.

- Total load: 300 t;
- Max axle load: – 11,5 t;
- Legs with equipment: 39,964 t;
- Pontoon with equipment: 95,846 t;
- Start and end ramp: 9,339 t;
- Total bridge weight: 153,810 t.

- Total load: 240 t;
- Max axle load: – 11,5 t;
- Legs with equipment: 30,054 t;
- Pontoon with equipment: 76,896 t;
- Start and end ramp: 9,339 t;
- Total bridge weight: 106,950 t.