Water heater 1500lx3 with Norsok M-501 painting requirements delivery 2015-03-27

Description

Metal production engineering part and outsourced production. Similar volume model was given by client for engineering and production task.

 

Metal production engineering services:

  • Strength calculations acc. EN13445 of new model and fabrication drawings

Metal Production outsourced production:

  • Metal Production created drawings related to factory requirements
  • Metal production organized technical meetings and each step inspection
  • Documentation follow up and inspection: Quality Control Plan, WPQR, WPS, Production plan, Painting procedure (according to NORSOK M-501), NDT reports, X - ray films, as built drawing, final documentation, third party documentation/certificates 
  • Review of raw material certificates and traceability insurance
  • Welding and welds quality inspection
  • Required tolerance assurance
  • Necessary action implementation corresponding quality failure
  • Necessary action implementation corresponding production schedule delay
  • Pressure test witness 
  • Logistic and custom clearance assurance

Details

GET IN TOUCH